Battery Box Completion and Testing

As the title suggests, the battery box (and all the electronics within it) has been assembled and is currently being tested up at CAPE. We have also shock tested the overall battery, which involved frantically running up and down King’s Parade on the cobbles to see if anything broke (at present, nothing has!). This of course produced a lot of interest, and we had a talk with a group of curious french schoolchildren about CUER, the battery pack, and Global Green Challenge. You never know, we may yet have some more international Friends of CUER!

As a result of the credit crunch, CUER's original solar car design had to be downgraded slightly.

As a result of the credit crunch, CUER's original solar car design had to be downgraded slightly.

Many thanks to everyone that helped out, especially James and Andrew for doing the actual trolley-ing! You didn’t look like muppets at all…

This entry was posted in Electrical. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

@cuerSolarTeam on Twitter

  • Prototype is starting to take shape, steering column installed today along with rear suspension fittings. Seat mountings on their way
    15 May 2012 18:28
  • Would love to show the twitter verse shiny images of our new prototype but design is top secret. We have big plans for the launch!
    12 May 2012 13:41
  • Prototype chassis now here, much thanks to guys over in rapid prototyping at #JLR
    11 May 2012 11:51
  • All day meeting to start the handover between the current team and next years team. Good to meet the new guys!
    10 May 2012 10:36
  • Third and fourth year engineering exams nearly over for all of us, yay! Lots more time to work on the vehicle :-)
    6 May 2012 10:08